INDUSVINA | Bridging Vietnam's Manufacturing, Construction and Supply Strengths with Global Markets.

Hotline: 0979823639

Thêm giỏ hàng thành công.
INDUSVINA

Tài Liệu An Toàn Trong Xây Dựng – Checklist, Quy Trình, Ma Trận Rủi Ro

Practical Experience in Choosing Construction Scaffolding

Practical Experience in Choosing Construction Scaffolding

16.12.2025Views: 3722

Practical Experience in Choosing Construction Scaffolding - practical knowledge information from INDUSVINA for customers, partners and professionals in Vietnam and...
See more
The HSE Operating System for Construction and Industry

The HSE Operating System for Construction and Industry

01.04.2026Views: 720

Explore the HSE Operating System from engineering, science and management perspectives with standards, legal requirements, Root Cause Analysis, real lessons and practical checklists for construction, MEP and MRO.
See more
Construction Risk Assessment Guide

Construction Risk Assessment Guide

10.12.2025Views: 6904

Complete guide to Construction Risk Matrix including 3x3, 4x4 and 5x5 risk assessment, JSA, hazard identification, risk ranking and practical HSE control measures.
See more
Lesson 4/4 — Safety: KPIs for Measuring Safety

Lesson 4/4 — Safety: KPIs for Measuring Safety

10.12.2025Views: 3784

In construction project management, safety cannot be based on feeling alone. Without measurement, all declarations of "safe construction site," "no accidents," and "we prioritize safety" are just slogans. Measuring safety helps: Determine whether the safety system is functioning or merely exists on paper. Identify weaknesses and bottlenecks for continuous improvement. Transform safety responsibilities into specific indicators for each department and position. Create a sustainable safety culture that is not dependent on individual will. A golden rule: Without measurement, there is no management. Without management, there is no improvement.
See more
LESSON 3/4 — SAFETY: THE PILLAR OF PM'S SAFETY MANAGEMENT

LESSON 3/4 — SAFETY: THE PILLAR OF PM'S SAFETY MANAGEMENT

10.12.2025Views: 3585

A good project manager (PM) doesn't just focus on meeting deadlines, quality standards, or budget. Their most important task is ensuring absolute safety in every construction activity. In fields like factory construction, bridge and road building, infrastructure development, prefabricated steel structures, export supply chains, or even the coffee business, a small incident can damage reputation and cause significant losses.
See more
LESSON 1/4 — SAFETY: WORKING FLOOR COLLAPSE DUE TO “UNESTIMATED LOAD”

LESSON 1/4 — SAFETY: WORKING FLOOR COLLAPSE DUE TO “UNESTIMATED LOAD”

10.12.2025Views: 183

In construction, there are mistakes that do not have immediate consequences - but just a moment of carelessness, a decision to "estimate" instead of calculate, all can cost lives, property, business reputation and the future of the entire project. "Estimating load" is a common habit in many small constructions and large projects, stemming from the mindset of doing it quickly - getting it done - trusting personal experience instead of complying with technical standards. Safety is not a slogan hanging on the wall. Safety is a system of calculation - control - monitoring - measurement. Just a small error in load estimation is enough to create a chain disaster.
See more
LESSON 2/4 — SAFETY: RISK MATRIX

LESSON 2/4 — SAFETY: RISK MATRIX

10.12.2025Views: 3845

Tools for assessing — prioritizing — controlling risks in construction In construction, accidents do not happen because of “bad luck”, but because of not seeing the risk or misjudging the level of danger. This is the reason why the “Risk Matrix” has become a mandatory tool in the safety system of professional contractors.
See more
Lesson 4/5 — Pillar 4: On-site Monitoring

Lesson 4/5 — Pillar 4: On-site Monitoring

12.12.2025Views: 3729

The five pillars of a safety management system: 1. Pillar 1 — Joint Risk Assessment (JSA) before each task 2. Pillar 2 — Work Procedures and Authorizations (PTW) 3. Pillar 3 — Skills Training and Testing 4. Pillar 4 — On-site Supervision 5. Pillar 5 — Incident Investigation and Continuous Improvement
See more
Lesson 2/5 — Pillar 2: Procedures & Work Permits (PTW)

Lesson 2/5 — Pillar 2: Procedures & Work Permits (PTW)

11.12.2025Views: 3781

The five pillars of a safety management system are: 1. Pillar 1 — Joint Risk Assessment (JSA) before each task; 2. Pillar 2 — Work Procedures and Authorizations (PTW); 3. Pillar 3 — Training and Skills Assessment; 4. Pillar 4 — On-site Supervision; 5. Pillar 5 — Incident Investigation and Continuous Improvement.
See more

Tài Liệu An Toàn Trong Xây Dựng – Checklist, Quy Trình, Ma Trận Rủi Ro

Tại Sao Cần Tài Liệu An Toàn Trong Thi Công? Bộ Biểu Mẫu An Toàn Được INDUSVINA Cung Cấp Quy Trình Đánh Giá Rủi Ro Tại Công Trường Hệ Thống Tiêu Chuẩn TCVN – ISO – OSHA

Ma trận rủi ro 5x5 theo chuẩn quốc tế Checklist kiểm tra an toàn trước khi thi công Biện pháp phòng ngừa tai nạn ngã cao