Lesson 1/5 – Initiating – Project Initialization

Lesson 1/5 – Initiating – Project Initialization

02.12.2025Views: 3430

Initiation is the “first gate” of every project: where we define what the project is, why it needs to be done, who is involved, and who is responsible. If this step is superficial, the whole project can easily drift and conflict.
See more
LESSON 3/5: EXECUTING – PROJECT IMPLEMENTATION

LESSON 3/5: EXECUTING – PROJECT IMPLEMENTATION

02.12.2025Views: 3649

If the Planning phase accounts for 60–70% of thinking, then Executing is where all ideas, drawings, diagrams, WBS, CPM progress, cost baselines… are turned into real actions. This is where: ✔ Plan becomes reality ✔ Resources are consumed ✔ Products/services are formed ✔ Risks, conflicts, and information deficiencies are most clearly revealed According to PMBOK® Guide – PMI (Project Management Institute), the Executing process group is the focus to demonstrate the Project Manager’s capacity in managing people – resources – communication – contracts – quality.
See more
LESSON 4/4 – ACCEPTANCE & PAYMENT – TRANSPARENCY STANDARDS

LESSON 4/4 – ACCEPTANCE & PAYMENT – TRANSPARENCY STANDARDS

09.12.2025Views: 4038

A project is only truly completed when the acceptance documents are complete - payment is made according to regulations - the responsibilities of all parties are clear. This is not just an administrative procedure, but a milestone that demonstrates the professional culture and commitment of the contractor to the Investor and society. At INDUSVINA, acceptance and payment are considered the final standards to affirm the quality - discipline - reputation of the entire construction process.
See more
Lesson 11/13 – Acceptance – Handover – Warranty – Maintenance of construction works (According to the Construction Law 2014, amended in 2020 and guiding decrees)

Lesson 11/13 – Acceptance – Handover – Warranty – Maintenance of construction works (According to the Construction Law 2014, amended in 2020 and guiding decrees)

28.11.2025Views: 4064

Lesson 11/13 concludes the “post-construction value chain”: from acceptance, handover to warranty and maintenance – where: The real quality of the project is verified. The legal responsibilities of the contractor, investor and management unit are “defined”. The safety, longevity and economic efficiency of the project are guaranteed throughout its life cycle. The INDUSVINA team sincerely thanks you for taking the time to read, research and apply.
See more
ARTICLE 5/13 DESIGN IN CONSTRUCTION

ARTICLE 5/13 DESIGN IN CONSTRUCTION

27.11.2025Views: 3436

Construction design is the process of transforming project requirements into a system of drawings, models, and technical parameters that serve as a legal and technical basis for construction, acceptance, and operation of the project. This is a key step in construction project management, determining: Safety, functionality, and longevity of the project Aesthetics, technical consistency, and economic efficiency Compliance with laws, planning, and urban/rural development orientation Without a proper design, the project is sure to be wrong from the start.
See more
5 PROCESS GROUPS IN PROJECT MANAGEMENT ACCORDING TO PMBOK (PMI - USA)

5 PROCESS GROUPS IN PROJECT MANAGEMENT ACCORDING TO PMBOK (PMI - USA)

25.11.2025Views: 4360

The 5 process groups of PMBOK form the “backbone” for all projects, from small to large. When applied correctly — especially in construction, industrial, infrastructure, manufacturing, and export businesses like INDUSVINA — you will: Reduce risks and errors, Increase cost and schedule control, Increase output quality, Optimize team capacity and project efficiency.
See more
LESSON 13/13 Highlights of the 2020 Amendment Law – the legal “backbone” for the new development stage

LESSON 13/13 Highlights of the 2020 Amendment Law – the legal “backbone” for the new development stage

28.11.2025Views: 3856

The series of 13 articles that INDUSVINA has written on the 2014 Construction Law - amended in 2020 is not intended to replace the original legal document, but: Help engineers, architects, project management officers, contractors, investors, and construction students have an "open document" to start in the right direction. Help busy working people quickly look up and systematize, from overview to each topic: planning, project management, design, licenses, contractor selection, contracts, construction, quality, safety, acceptance - warranty - maintenance and finally the outstanding new points of the amended Law 2020.
See more
What do field engineers do

What do field engineers do

28.11.2025Views: 4474

Discover what a site engineer really does, from shop drawings and planning to ITP, NCR, RFI, inspections, quality control, handover and construction management.
See more
THE SHORTEST CLASSIFICATION OF WORKS

THE SHORTEST CLASSIFICATION OF WORKS

26.11.2025Views: 2712

Understand the right level of construction to manage the project safely - legally - optimally at cost. Simple and easy to understand Mimap diagram
See more

Kiến Thức Quản Lý Dự Án (QLDA) Toàn Diện Từ Cơ Bản Đến Nâng Cao

Hệ Thống Quản Trị Dự Án Thực Tiễn Ứng Dụng Trong Xây Dựng, Công Nghiệp Và Xuất Khẩu

Phương Pháp Quản Lý Tiến Độ – Chi Phí – Rủi Ro – Chất Lượng Theo Chuẩn Quốc Tế