INDUSVINA | Bridging Vietnam's Manufacturing, Construction and Supply Strengths with Global Markets.

Hotline: 0979823639

Thêm giỏ hàng thành công.
INDUSVINA

LESSON 3/5: EXECUTING – PROJECT IMPLEMENTATION

Part 3/5 – EXECUTING – PROJECT EXECUTION

Turning plans into real products, real work, and real value

Listen to this article:

1. Role of the Executing Phase

This is the action phase where schedules, drawings, WBS packages and baselines for time, cost and quality are converted into tangible outcomes and measurable value.

"Without deliverables, a project is not complete. Without execution, there is no value."

According to the PMBOK® Guide by PMI, Executing is the process group where most of the project's real value is created.

2. Key Components of the Executing Phase

2.1 Resource Allocation & Coordination

ResourceExecution Focus
Human ResourcesAssignments, KPIs, performance and productivity management
MaterialsInventory control, usage against standards, timely supply
EquipmentMaintenance, utilization optimization, reduce downtime
Financial ResourcesCash flow, payments, variance against cost baseline
A great Project Manager does not chase tasks – they orchestrate the flow of resources.

2.2 Construction – Production – Implementation

This is where deliverables are built according to approved designs, technical specifications and QA/QC procedures.

2.3 Contractor, Supplier & Contract Management

Contracts are living documents that must be monitored throughout the project: changes, delays, claims and disputes must be governed, not improvised.

2.4 QA/QC and Safety

INDUSVINA adheres to the principle: "Better not to do it than to do it without guaranteed quality."

2.5 Reporting, Meetings & Communication

Around 80% of a Project Manager's work is communication. Poor communication leads to wrong expectations and conflicts.

3. Purpose of Executing

PLAN → CORRECT EXECUTION → REAL PRODUCT → REAL VALUE

A project is only recognized when real deliverables exist and are accepted.

4. Conclusion

You have completed Part 3/5. Next is Part 4: Monitoring & Controlling – the phase that decides whether the project stays on track or drifts away from plan.

© INDUSVINA – Discipline – Responsibility – Connection.
Related Articles
Construction project management
Construction project management
Construction project management - practical knowledge information from INDUSVINA for customers, partners and professionals in Vietnam and international markets.
More Details
Latest Construction Law
Latest Construction Law
Latest Construction Law - practical knowledge information from INDUSVINA for customers, partners and professionals in Vietnam and international markets.
More Details
LESSON 3: CONSTRUCTION PROJECT OPERATING SYSTEM
LESSON 3: CONSTRUCTION PROJECT OPERATING SYSTEM
Projects do not fail because of engineering alone. They break down because operations are fragmented. Most construction projects do not collapse because the team lacks technical capability....
More Details
Article 2: THE 4 PILLARS OF PROJECT MANAGEMENT – MISS ONE PILLAR, THE SYSTEM COLLAPSES
Article 2: THE 4 PILLARS OF PROJECT MANAGEMENT – MISS ONE PILLAR, THE SYSTEM COLLAPSES
INDUSVINA Viewpoint Miss one pillar and the project doesn’t just weaken — it loses balance and collapses. Project management is building an operating system, not merely “getting tasks done....
More Details
LESSON 1: WHAT IS CONSTRUCTION PROJECT MANAGEMENT?
LESSON 1: WHAT IS CONSTRUCTION PROJECT MANAGEMENT?
In the construction industry, many people confuse: A site supervisor A construction coordinator And a true project manager. A good site supervisor can help a project progress quickly....
More Details
Lesson 2/4 – Quality
Lesson 2/4 – Quality
Quality is not just about looks, nor is it about “doing it by experience” or “finishing it and then adjusting it later”. In construction projects, QUALITY = THE DEGREE OF CONFORMITY of the...
More Details
Lesson 5/5 – Closing / Project completion according to PMI – transparent, sufficient, standard & responsible closing
Lesson 5/5 – Closing / Project completion according to PMI – transparent, sufficient, standard & responsible closing
Closing is not just “closing the file”, but the time to prove the true value of the entire project: acceptance – handover – contract closing – lessons learned – file storage, from the perspective...
More Details
LESSON 4/5: Project Monitoring & Control
LESSON 4/5: Project Monitoring & Control
If Initiating is defining the goal, Planning is drawing the map, Executing is marching, then Monitoring & Controlling is the “sword and shield” of the project manager – both attacking deviations...
More Details
Lesson 2/5 – Create a detailed, feasible, and controllable project plan
Lesson 2/5 – Create a detailed, feasible, and controllable project plan
Objectives of the Planning phase: ✔️ Define the entire scope of work ✔️ Design a clear, feasible implementation roadmap ✔️ Anticipate risks and countermeasures ✔️ Clarify quality, cost, information,...
More Details
Lesson 1/5 – Initiating – Project Initialization
Lesson 1/5 – Initiating – Project Initialization
Initiation is the “first gate” of every project: where we define what the project is, why it needs to be done, who is involved, and who is responsible. If this step is superficial, the whole...
More Details

INDUSVINA – International Standard Industrial EPC & MRO Contractor

EPC Construction – M&E Engineering – Steel Structures – Global Export Services

Trusted Partner for Industrial Plants, Manufacturing & FDI Enterprises