Lesson 2/4 – Quality

Series: Four core duties of a Construction Project Manager · Article 2/4 – Quality

Quality – The Second Core Duty of a Construction Project Manager

Estimated listening time: calculating...

Quality is not “doing something good enough to pass inspection” – it is the professional honor of people who build.

1. What does “quality” really mean in construction projects?

Quality is not just about good appearance, and it is not “based on experience” or “we will adjust later if needed”.

In construction projects, QUALITY = THE DEGREE OF CONFORMANCE of the product to:

  • The approved design documents
  • The applicable technical standards (TCVN, QCVN, Eurocode, ASTM, AWS…)
  • The relevant legal and regulatory requirements
  • The quality clauses of the contract with the Client

Quality does not appear by itself – it is managed, measured and controlled.

2. Legal and technical framework that governs quality

A Project Manager who does not understand standards and regulations cannot truly manage quality.

2.1. Laws and regulations

  • The Construction Law and its amendments.
  • Procurement and contract regulations for construction.
  • Regulations on construction quality management (e.g., Decree 06/2021/ND-CP in Viet Nam).

2.2. Vietnamese codes and standards

  • QCVN 16 – National technical regulation on products and goods of building materials.
  • QCVN 09 – Energy efficiency of buildings.
  • TCVN 4453 – Construction and acceptance of reinforced concrete structures.
  • TCVN 5574 – Design of reinforced concrete structures.
  • TCVN 93xx – Testing and inspection of concrete and structures.

2.3. International standards

  • ISO 9001 – Quality management systems.
  • ASTM, ACI – Concrete and material standards.
  • AWS D1.1 – Welding standards.
  • Eurocode – Widely used in bridge and steel structure design.

A product that does not conform to standards is a nonconforming product – even if it “looks good”. The Client and the Consultant have full rights to reject acceptance when standards are not met.

3. The “quality triangle”: Scope – Tolerance – Acceptance

To manage quality, a Project Manager must at least control three key elements:

Element Practical meaning
Scope Exactly what must be done? Where does the work start and end? What is not included?
Tolerance To what level is workmanship acceptable? How much deviation is allowed? Under which standard?
Acceptance Who accepts the work, with what criteria, and with which documents?

Tolerances are often the silent killer of construction projects: a structure that looks good but is off by 3 mm at a critical location may still need to be demolished.

4. Quality documentation – the “brain” of the project

Quality lives not only on site, but also in the documentation system. The Project Manager should ensure at least the following:

  • Approved method statements for all major activities.
  • Inspection and test plans (ITPs) / checklists for every task and trade.
  • Site diaries with accurate records of manpower, equipment and conditions.
  • Material test reports (concrete, rebar, finishing materials…).
  • As-built drawings that reflect what has actually been constructed.
  • Inspection and calibration records for equipment (cranes, hoists, key machinery).

No documents – no proof of quality. In disputes, people do not only look at the structure, they look at the documents to determine responsibility.

5. Quality control along the project life cycle

Quality is not something to “worry about at the end”. It must be managed throughout the whole project life cycle:

Phase Role of quality management
Initiation Define quality requirements, applicable standards and success criteria.
Planning Develop quality plans, ITPs, test plans and inspection methods.
Execution Build according to approved methods and standards, record everything properly.
Monitoring & Controlling Inspect, test, identify nonconformities and decide on corrective actions.
Closing Hand over the full quality dossier, capture lessons learned for future projects.

Quality is not just the job of the QC department. It is a mindset shared by the whole project team – from the Project Manager and Site Manager to every engineer and foreman on site.

6. Tolerances – the silent killer of projects

In many projects, failure does not come from a single huge mistake, but from small tolerances that are ignored every day:

  • Reinforcement shifted 5–7 mm from the designed position.
  • Slab levels off by 10 mm from the datum.
  • Unevenness of walls, ceilings and floors exceeding the permitted limits.
  • Stone and tile finishes not aligned, leading to visible “waves” and misalignment.

One inaccurate measurement can make the whole team pay the price. The later deviations are detected, the more expensive the corrections will be.

7. Case study: Demolishing the whole façade because of 1.5 mm

7.1 Background

A hotel project with a high-end granite façade. The installation crew did not use laser levels and precise measuring tools, relying mostly on eye judgement and manual measurements.

7.2 Accumulated deviation

Each vertical line of cladding deviated about 1.5 mm from the adjacent one. On the first floor, this was hardly visible. But by the fifth floor, the total misalignment exceeded 15 mm and became clearly noticeable.

7.3 Consequences

  • The Client refused to accept the façade.
  • The entire misaligned granite cladding had to be dismantled and redone.
  • Material and labor losses reached several billion VND.
  • The contractor’s reputation was seriously damaged.

7.4 Lessons learned

Small tolerances can cause huge consequences. If tolerances are not controlled from the start – using proper standards, tools and inspection procedures – then quality depends only on “luck”.

8. Quality KPIs for Project Managers

Some simple but very telling indicators of a PM’s quality management capability:

  • % of work items accepted at first inspection (no rework, no repair).
  • % of materials passing tests at first attempt.
  • Number of defects detected internally before client inspection.
  • Number of rework / demolition incidents per work package.

If these indicators are strong, the system is likely healthy. If they are weak, it means the PM is not truly in control of quality or the quality system has serious gaps.

9. INDUSVINA’s quality culture

At INDUSVINA, quality is not just a “contract requirement” – it is the professional honor of construction engineers and managers.

Our quality culture stands on four pillars:

  • Standardization: everything has standards, procedures and templates.
  • Technical evidence: decisions are backed by data, tests and records.
  • No compromise on tolerances: if it is wrong, we fix it – no “let it slide for now”.
  • No shortcuts: we prefer to redo the work properly rather than hand over something that only “looks good on the surface”.

Quality is not just for handover – it is so we can confidently face the law, the auditors and, above all, our own professional conscience.

10. Conclusion – Quality as the PM’s professional honor

A quality project does not come from promises, personal “experience” or the sentence “I’ve done this many times, don’t worry”.

It comes from:

  • Standards – clear technical criteria.
  • Control – inspection, testing and strict acceptance.
  • Documentation – evidence of compliance.
  • Tolerances – controlled from the beginning, not accumulated.
  • Acceptance – transparent, documented and professional.

If a Project Manager cannot manage quality, the PM has failed – no matter how fast the schedule is.

Talk to INDUSVINA about quality management in construction projects

If you are facing issues with tolerances, rework, disputes on acceptance or need a robust quality documentation system for your projects, INDUSVINA’s engineers and project managers are ready to help.

Related Articles
Construction project management
Construction project management
Construction project management - practical knowledge information from INDUSVINA for customers, partners and professionals in Vietnam and international markets.
More Details
Latest Construction Law
Latest Construction Law
Latest Construction Law - practical knowledge information from INDUSVINA for customers, partners and professionals in Vietnam and international markets.
More Details
LESSON 3: CONSTRUCTION PROJECT OPERATING SYSTEM
LESSON 3: CONSTRUCTION PROJECT OPERATING SYSTEM
Projects do not fail because of engineering alone. They break down because operations are fragmented. Most construction projects do not collapse because the team lacks technical capability....
More Details
Article 2: THE 4 PILLARS OF PROJECT MANAGEMENT – MISS ONE PILLAR, THE SYSTEM COLLAPSES
Article 2: THE 4 PILLARS OF PROJECT MANAGEMENT – MISS ONE PILLAR, THE SYSTEM COLLAPSES
INDUSVINA Viewpoint Miss one pillar and the project doesn’t just weaken — it loses balance and collapses. Project management is building an operating system, not merely “getting tasks done....
More Details
LESSON 1: WHAT IS CONSTRUCTION PROJECT MANAGEMENT?
LESSON 1: WHAT IS CONSTRUCTION PROJECT MANAGEMENT?
In the construction industry, many people confuse: A site supervisor A construction coordinator And a true project manager. A good site supervisor can help a project progress quickly....
More Details
Lesson 5/5 – Closing / Project completion according to PMI – transparent, sufficient, standard & responsible closing
Lesson 5/5 – Closing / Project completion according to PMI – transparent, sufficient, standard & responsible closing
Closing is not just “closing the file”, but the time to prove the true value of the entire project: acceptance – handover – contract closing – lessons learned – file storage, from the perspective...
More Details
LESSON 4/5: Project Monitoring & Control
LESSON 4/5: Project Monitoring & Control
If Initiating is defining the goal, Planning is drawing the map, Executing is marching, then Monitoring & Controlling is the “sword and shield” of the project manager – both attacking deviations...
More Details
Lesson 2/5 – Create a detailed, feasible, and controllable project plan
Lesson 2/5 – Create a detailed, feasible, and controllable project plan
Objectives of the Planning phase: ✔️ Define the entire scope of work ✔️ Design a clear, feasible implementation roadmap ✔️ Anticipate risks and countermeasures ✔️ Clarify quality, cost, information,...
More Details
Lesson 1/5 – Initiating – Project Initialization
Lesson 1/5 – Initiating – Project Initialization
Initiation is the “first gate” of every project: where we define what the project is, why it needs to be done, who is involved, and who is responsible. If this step is superficial, the whole...
More Details
LESSON 3/5: EXECUTING – PROJECT IMPLEMENTATION
LESSON 3/5: EXECUTING – PROJECT IMPLEMENTATION
If the Planning phase accounts for 60–70% of thinking, then Executing is where all ideas, drawings, diagrams, WBS, CPM progress, cost baselines… are turned into real actions. This is where: ✔...
More Details

INDUSVINA – International Standard Industrial EPC & MRO Contractor

EPC Construction – M&E Engineering – Steel Structures – Global Export Services

Trusted Partner for Industrial Plants, Manufacturing & FDI Enterprises