LESSON 4/5: Project Monitoring & Control

Monitoring & Controlling – Keeping the Project on Track

The “sword and shield” of the project manager – making sure the project does not slip in schedule, cost or quality.
If Initiating defines the goal, Planning draws the map and Executing is the journey itself, then Monitoring & Controlling is the “sword and shield” that keeps the project safe from deviations and risks.
???? Listen to this article:
Estimated duration: — | Speed: 1.0x

1. Why Monitoring & Controlling matters

In this process group, the project manager constantly compares the approved plan (baseline) with the current reality to detect deviations early and correct them in time. Without monitoring and controlling, a project can be busy every day yet drift far away from its original goal.

Simple picture: Monitoring & controlling a project is like building a house or a kiosk: you keep checking whether the workers are following the agreed dimensions, materials, schedule and cost.

Key aspects to keep under control include:

  • Schedule: Is the work progressing according to the agreed timeline?
  • Cost: Is the spending still in line with the budget?
  • Quality: Is the work being done to the required standard?
  • Risk: Are potential problems identified and managed?
  • Change: Are changes controlled or are they happening chaotically?

2. Measuring schedule, output and quality against the baseline

The baseline is your “reference line” for scope, schedule and cost. Monitoring means continuously asking: “Where are we now compared to the plan?”

Everyday example: Building a gate

Imagine you agree with a small contractor that:

  • The gate will be done in 7 days.
  • The expected cost is 15 million VND.
  • Materials: steel frame, powder coating, simple decorations.

After 4 days you inspect the work and see:

  • The frame is welded but the panels are not installed yet.
  • No grinding, finishing or painting has been done.
  • The overall progress is only around 20–30%.

This clearly shows the project is behind schedule. Without timely action (discussing with the contractor, adjusting manpower, revising the plan), you may miss the promised completion date.

3. Controlling cost with Earned Value Management (EVM)

Earned Value Management (EVM) is a method to evaluate if the cost you have spent is reasonable compared to the value of the work completed.

EVM helps you answer three core questions:

  • How much work has been completed?
  • How much money has been spent?
  • Is the money spent “worth” the completed work?

Example: Tiling the floor of a kiosk

You make a deal with a tiler:

  • Lump-sum price: 10 million VND.
  • Duration: 2 days.

After 1 day you check the site:

  • Only about 50% of the floor area is tiled.
  • But you have already paid the worker 8 million VND.

Here, the value of work done (50%) is not aligned with the money paid (80%). You are effectively paying ahead, which is risky if the worker slows down or walks away.

4. Monitoring risks and activating responses

In real life, risks are everywhere: weather, material prices, labor, regulations and so on. Monitoring risk means always asking: “If something goes wrong, what will we do?”

Example: Building a small shop and facing heavy rain

Possible risks include:

  • Continuous rain that makes concrete pouring impossible.
  • Delayed delivery of steel or bricks.
  • The key worker suddenly quits.

Potential responses could be:

  • Installing covers and rearranging tasks (do indoor work first, outdoor work later).
  • Having alternative suppliers ready, not relying on just one source.
  • Keeping a list of backup workers or teams to increase manpower when needed.

5. Applying change control

Change is almost guaranteed in any project. The key question is not whether changes will happen but whether they are controlled.

Example: A gate project with extra requests

Initially, the homeowner only orders:

  • One steel gate with simple decorations.

Later, they add new requests:

  • Install decorative lighting.
  • Use special “wood effect” coating.
  • Add a glass canopy above the gate.

If these changes are not clearly documented, priced and scheduled, the contractor may work more while the owner thinks it is “included in the original quote”. At the end, they easily argue about “Why are you charging extra?”

A proper Change Control process ensures that every change is:

  • Recorded in writing.
  • Assessed in terms of additional cost, time and resources.
  • Approved by the owner before execution.

6. Reporting to the owner and stakeholders

Reporting is not for “paperwork only”. It makes information transparent and traceable among all parties: the owner, contractor, consultants and supervisors.

A solid monitoring report often answers:

  • Schedule: Where are we now? Ahead or behind the plan?
  • Cost: How much have we spent? How does it compare to the budget?
  • Quality: Any items that need rework?
  • Risk: Any incidents? How were they handled? Any remaining threats?
  • Change: Any scope changes? Were they agreed with the owner?

7. The ultimate goal of Monitoring & Controlling

The Monitoring & Controlling process group aims to:

  • Keep the project aligned with its original objectives.
  • Prevent schedule slippage as much as possible.
  • Prevent uncontrolled cost overrun – any extra cost is explained and agreed.
  • Maintain quality – reduce rework and defects.
  • Control scope – every change goes through a clear decision process.

In short: Monitoring & Controlling is like driving a car while watching the steering wheel, speedometer and mirrors at the same time. Without it, the project can easily “crash” or get lost.

Successful projects are not just lucky. They are the result of good planning, continuous monitoring and timely control actions.

Related Articles
Construction project management
Construction project management
Construction project management - practical knowledge information from INDUSVINA for customers, partners and professionals in Vietnam and international markets.
More Details
Latest Construction Law
Latest Construction Law
Latest Construction Law - practical knowledge information from INDUSVINA for customers, partners and professionals in Vietnam and international markets.
More Details
LESSON 3: CONSTRUCTION PROJECT OPERATING SYSTEM
LESSON 3: CONSTRUCTION PROJECT OPERATING SYSTEM
Projects do not fail because of engineering alone. They break down because operations are fragmented. Most construction projects do not collapse because the team lacks technical capability....
More Details
Article 2: THE 4 PILLARS OF PROJECT MANAGEMENT – MISS ONE PILLAR, THE SYSTEM COLLAPSES
Article 2: THE 4 PILLARS OF PROJECT MANAGEMENT – MISS ONE PILLAR, THE SYSTEM COLLAPSES
INDUSVINA Viewpoint Miss one pillar and the project doesn’t just weaken — it loses balance and collapses. Project management is building an operating system, not merely “getting tasks done....
More Details
LESSON 1: WHAT IS CONSTRUCTION PROJECT MANAGEMENT?
LESSON 1: WHAT IS CONSTRUCTION PROJECT MANAGEMENT?
In the construction industry, many people confuse: A site supervisor A construction coordinator And a true project manager. A good site supervisor can help a project progress quickly....
More Details
Lesson 2/4 – Quality
Lesson 2/4 – Quality
Quality is not just about looks, nor is it about “doing it by experience” or “finishing it and then adjusting it later”. In construction projects, QUALITY = THE DEGREE OF CONFORMITY of the...
More Details
Lesson 5/5 – Closing / Project completion according to PMI – transparent, sufficient, standard & responsible closing
Lesson 5/5 – Closing / Project completion according to PMI – transparent, sufficient, standard & responsible closing
Closing is not just “closing the file”, but the time to prove the true value of the entire project: acceptance – handover – contract closing – lessons learned – file storage, from the perspective...
More Details
Lesson 2/5 – Create a detailed, feasible, and controllable project plan
Lesson 2/5 – Create a detailed, feasible, and controllable project plan
Objectives of the Planning phase: ✔️ Define the entire scope of work ✔️ Design a clear, feasible implementation roadmap ✔️ Anticipate risks and countermeasures ✔️ Clarify quality, cost, information,...
More Details
Lesson 1/5 – Initiating – Project Initialization
Lesson 1/5 – Initiating – Project Initialization
Initiation is the “first gate” of every project: where we define what the project is, why it needs to be done, who is involved, and who is responsible. If this step is superficial, the whole...
More Details
LESSON 3/5: EXECUTING – PROJECT IMPLEMENTATION
LESSON 3/5: EXECUTING – PROJECT IMPLEMENTATION
If the Planning phase accounts for 60–70% of thinking, then Executing is where all ideas, drawings, diagrams, WBS, CPM progress, cost baselines… are turned into real actions. This is where: ✔...
More Details

INDUSVINA – International Standard Industrial EPC & MRO Contractor

EPC Construction – M&E Engineering – Steel Structures – Global Export Services

Trusted Partner for Industrial Plants, Manufacturing & FDI Enterprises