STEEL & BUILDING MATERIALS · PC STRAND
Prestressing strand.
Right specifications. Complete documentation.
Start with the design when sourcing strand for bridges, beams, slabs or precast units. Clarify diameter, strength grade, relaxation, anchorage compatibility and lot traceability before ordering.
Send the available specifications, estimated quantity and delivery location. We will clarify the details with you.
Know the product you need
Prestressing strand is high-strength steel tensioned to introduce compression into concrete. PC Strand commonly consists of seven wires; performance depends on the design, materials and execution of the complete system.
Bridges & infrastructure
Bridge girders, viaducts and transport structures in accordance with approved design documents.
Beams, slabs & factories
Prestressed structures designed for the project’s span, loading and functional requirements.
Precast units
Beams, piles and units using prestressing steel suited to the production process and design.
PC Strand, PC Wire and PC Bar are different products. They are not interchangeable simply because they are all described as prestressing steel.

of a complete system.Anchorages, stressing equipment and protective measures must suit the designed prestressing system.Illustration only. Actual arrangement follows the project documents.
What should be agreed before requesting a quote?
A request for “15.2 mm strand pricing” is not enough to compare suppliers.
| Item | Information to confirm |
|---|---|
| Standard & edition | Follow the project specification. Where ASTM A416/A416M is specified, confirm low-relaxation seven-wire strand and the required edition. |
| Dimensions & properties | Nominal diameter, cross-sectional area, strength grade, relaxation and test requirements under the applicable standard. |
| System type & protection | Pre-tensioned or post-tensioned; bonded or unbonded; bare or protected strand as designed. Check anchorage compatibility. |
| Quantity & packaging | Total quantity, coil weight, coil labels, lot identification, storage requirements and unloading arrangements. |
| Documents & delivery | Mill Test Certificate (MTC), contract documents and additional tests where required; delivery location and phased schedule. |
A different standard, strength grade or protective system requires a technical comparison and approval by the authorised project parties before substitution.
Scope reference: ASTM A416/A416M. The edition used for procurement must follow the project documents.
Protect quality from receipt to use
Check coil labels, lot numbers, quantities and certificates. Record corrosion, damage or missing labels for assessment before use.
Keep coils raised and dry; prevent contamination and handling damage. Maintain traceability from the coil to its location of use.
Confirm concrete conditions and equipment calibration; compare stressing force, elongation and anchorage seating. Record deviations for resolution under the approved procedure.
For bonded post-tensioning, control grouting under the approved method. Retain the relevant material, stressing, protection and acceptance records.
Do not select stressing forces, deviation limits or construction sequences from this article. Follow the approved design and method statements.
How can INDUSVINA help?
Receive specifications, quantities, required documents and the delivery plan.
Discuss availability, material documentation and commercial conditions.
Agree packaging, schedules, documents and responsibilities for each order.
Availability, schedules and support scope are confirmed for each enquiry. Material approval and acceptance remain with the authorised project parties.
FROM SPECIFICATIONS TO A SUPPLY PLAN
Which project needs
prestressing strand?
Send the strand type, available specifications, quantity and delivery location. You can enquire before all details are ready.








