INDUSVINA | Bridging Vietnam's Manufacturing, Construction and Supply Strengths with Global Markets.

Hotline: 0979823639

Thêm giỏ hàng thành công.
INDUSVINA

INDUSVINA KNOWLEDGE CENTER

Lesson 1/6 – Responsibility

Lesson 1/6 – Responsibility

26.12.2025Views: 3094

Responsibility – the foundation of all lasting values “When something happens, the primary cause is me.” Not to blame yourself, but to stop blaming others and take control of the outcome.
See more
Maritime transport control

Maritime transport control

19.07.2026Views: 237

Maritime transport control - practical export information from INDUSVINA for customers, partners and professionals in Vietnam and international markets.
See more
Selecting bored pile construction technology

Selecting bored pile construction technology

13.04.2021Views: 14183

Compare Kelly, CFA, reverse circulation, barrette, hydraulic grab and rotary drilling by advantages, limitations, ground conditions and applications.
See more
Solutions for heat insulation in factory buildings

Solutions for heat insulation in factory buildings

22.04.2026Views: 605

Solutions for heat insulation in factory buildings - practical knowledge information from INDUSVINA for customers, partners and professionals in Vietnam and...
See more
LESSON 1/4 — SAFETY: WORKING FLOOR COLLAPSE DUE TO “UNESTIMATED LOAD”

LESSON 1/4 — SAFETY: WORKING FLOOR COLLAPSE DUE TO “UNESTIMATED LOAD”

10.12.2025Views: 175

In construction, there are mistakes that do not have immediate consequences - but just a moment of carelessness, a decision to "estimate" instead of calculate, all can cost lives, property, business reputation and the future of the entire project. "Estimating load" is a common habit in many small constructions and large projects, stemming from the mindset of doing it quickly - getting it done - trusting personal experience instead of complying with technical standards. Safety is not a slogan hanging on the wall. Safety is a system of calculation - control - monitoring - measurement. Just a small error in load estimation is enough to create a chain disaster.
See more
LESSON 2/4 — SAFETY: RISK MATRIX

LESSON 2/4 — SAFETY: RISK MATRIX

10.12.2025Views: 3836

Tools for assessing — prioritizing — controlling risks in construction In construction, accidents do not happen because of “bad luck”, but because of not seeing the risk or misjudging the level of danger. This is the reason why the “Risk Matrix” has become a mandatory tool in the safety system of professional contractors.
See more
Lesson 2/4 – Quality

Lesson 2/4 – Quality

08.12.2025Views: 3776

Quality is not just about looks, nor is it about “doing it by experience” or “finishing it and then adjusting it later”. In construction projects, QUALITY = THE DEGREE OF CONFORMITY of the product to: Approved design documents Applied technical standards (TCVN, QCVN, Eurocode, ASTM, AWS…) Relevant legal regulations Quality terms in the contract with the Investor Quality is not self-generated – it is managed, measured and controlled.
See more
History of Prestressed Concrete Technology

History of Prestressed Concrete Technology

06.12.2025Views: 3601

History of Prestressed Concrete Technology - practical knowledge information from INDUSVINA for customers, partners and professionals in Vietnam and international...
See more
Lesson 5/5 – Closing / Project completion according to PMI – transparent, sufficient, standard & responsible closing

Lesson 5/5 – Closing / Project completion according to PMI – transparent, sufficient, standard & responsible closing

02.12.2025Views: 4029

Closing is not just “closing the file”, but the time to prove the true value of the entire project: acceptance – handover – contract closing – lessons learned – file storage, from the perspective of PMI – PMBOK and Vietnamese law.
See more

INDUSVINA Knowledge Center

EPC Construction – M&E Engineering – Steel Structures – Global Export Services

Trusted Partner for Industrial Plants, Manufacturing & FDI Enterprises