INDUSVINA – Responsible technical tradingGENUINE PRODUCTS • CLEAR SPECIFICATIONS • FAST RESPONSE • GLOBAL DELIVERY

Choosing Green Materials for Construction

CONSTRUCTION MATERIALS · DOCUMENTATION AND SELECTION

Choosing green materials.
Compare equivalent performance and verify the evidence.

From design to procurement, define what the material must do, which impacts to reduce and what evidence supports the claim. Compare options on the same basis before ordering.

Meet performance needsSet technical requirements before comparing.
Verify the evidenceCheck the exact product and declaration scope.
Consider the life cycleInclude transport, use and replacement.

Set objectives before selecting materials

For projects in Vietnam, start with actual conditions such as humidity, intensity of use, maintenance capability and supply. Set requirements for structural performance, fire resistance, acoustics or indoor emissions for each application. Then define a verifiable environmental objective, such as using less material, reducing greenhouse gas emissions or improving reuse potential.

Green materials documentation checklist

CheckDocuments to reviewHow to verify
Technical performanceProject specifications, technical data and test reports.Check the product code and applicable assembly. For assembly-level properties, review evidence for the tested assembly.
Environmental impactEnvironmental product declaration (EPD), where available and relevant.Check the unit, product category rules (PCR) and life-cycle stages. Compare directly only when function and calculation basis are equivalent.
Origin and deliveryOrigin documents, batch labels, delivery notes and required certificates.Match delivered products to approved documents. Specify what must accompany each batch.
Use and replacementInstallation and maintenance instructions and expected service life.Include waste, transport, accessories, replacements and recovery conditions where applicable.

Reading an EPD: use the figures within their declared assessment scope. Selection also depends on the technical requirements of the application.

Example: comparing two partition systems

Compare one square metre of finished partition with the same specified acoustics, fire resistance and conditions of use. Count boards, framing, insulation, accessories and waste. Include any board replacement needed within the assessment period. Record missing data before drawing a conclusion.

Who does what from design to delivery?

Design and procurement

Define technical criteria, environmental data and required submissions in the request. Give suppliers a common comparison table. Train reviewers and specify who approves substitutions.

Manufacturers and site teams

Manufacturers track consumption, quality and batch traceability. Site teams verify deliveries, instruct installers and record discrepancies before use.

Businesses, testing bodies and public authorities can align disclosure and procurement guidance. Where the project specifies certificates or metrics, check the applicable documents and tender requirements.

What to send when comparing options

  • Application, performance needs and any drawings or specifications.
  • Material codes and the environmental or test documents to review.
  • Quantity, delivery location and dates for each batch.
Send requirements for a quote

Explore INDUSVINA

FROM SPECIFICATION TO SUPPLY

Which application needs
a material review?

Send the application, known specifications, quantity, delivery location and schedule. You can start with the details you already have.

INDUSVINA will use this number to discuss your request.

We use your contact details to receive and respond to your request.

INDUSVINA — SAFETY · SPEED · EFFICIENCY · WELL-BEING · TRUST.
ACCURATE · COMPLETE · CLEAN · PRACTICAL.

Standards – People – Technology – Policy: Four pillars for measurable “real green”

Not a slogan: measurable, verifiable, and applied under the right conditions