CONSTRUCTION MATERIALS · PRESTRESSING STEEL
Prestressing steel: construction and types.
Confirm the specification before ordering.
Check the drawings and specifications for the steel product, prestressing system and protection requirements. Use these to confirm the supply scope, accessories and documents to check at delivery.
What are you selecting?
Prestressing steel is tensioned to introduce compression into concrete and help control cracking and deflection as designed. Check which of these three product forms appears in the material schedule.
- PC Wire — a single prestressing steel wire. Check diameter, surface profile and mechanical properties against the project documents.
- PC Strand — prestressing steel strand. Seven-wire strand has one core wire and six outer wires. Check nominal diameter, strength grade, relaxation and protection.
- PC Bar — prestressing steel bar. Check bar dimensions, end details and compatible anchorages.
Each product has its own standards and connection requirements. Evaluate proposed substitutions and obtain approval through the project procedure.
Where will it be used? Quick selection by application
Use the table to locate the relevant information in the drawings, technical specifications and prestressing system documentation before requesting a quote.
| Application | Material or system | Documents and details to check |
|---|---|---|
| Pretensioned beams, piles or other precast members | PC Wire or PC Strand as specified for the member and production line. | Member drawings, material schedule and production instructions. Check product form, diameter, grade, surface and compatibility with production equipment. |
| Bonded post-tensioned slabs and beams | Strand and approved system components, including anchorages, wedges, ducts and grout as required by the purchase scope. | Tendon layout and system documentation. Check strand specification, strands per tendon, anchorage type, ducts and grouting requirements. |
| Unbonded post-tensioned slabs | Protection as specified by the approved system, commonly a greased single strand with plastic sheathing. | System documentation and anchorage details. Check strand size, sheathing, anchorage and end protection. |
| Bridge girders, infrastructure or components requiring specific corrosion protection | The prestressing system and corrosion protection specified for the component. | Specifications, drawings and system documents. Check requirements for strand, ducts or sheathing, anchorage ends, protective materials and supporting documents. |
| Anchorage or connection details specifying PC Bar | Prestressing bar and anchorages, nuts or couplers specified in the design. | Connection details and system documents. Check diameter, strength grade, length, thread type and accessory codes as required. |
See PC Strand specifications and request a quote
If the documents specify bare strand, PE/HDPE sheathing, galvanizing or epoxy coating, send that exact description together with the anchorage and end-protection requirements. Protection must suit the complete system and the design exposure conditions.
Common PC Strand configurations for bridges and commercial floors
Bridges. Bare seven-wire strand in Ø12.7 or Ø15.2 mm is commonly found in pretensioned bridge girders. Ø15.2 mm is common in bonded post-tensioned bridge systems with multistrand tendons in grouted ducts.
Unbonded commercial floors. Reference configurations include greased seven-wire monostrand in Ø12.7 or Ø15.2 mm with plastic sheathing. Check the strand, anchorage and end protection against the approved system.
Bonded post-tensioned commercial slabs or beams. Reference configurations include Ø12.7 or Ø15.2 mm seven-wire strands in grouted ducts. Use the drawings for the number of strands per tendon and the anchorages.
For quotes. Low-relaxation Grade 270 (1,860 MPa) is a common reference. Where ASTM A416/A416M is specified, check it for the bare strand and separately verify sheathing, anchorage and other system requirements. Use the approved documents to finalize size, grade and configuration.
References: FHWA bridge post-tensioning manual and RAM Concept guidance on building post-tensioning systems.
What should you confirm before requesting a quote?
| Order details | What to send |
|---|---|
| Project and application | Name the work item or member. Identify pretensioning, bonded post-tensioning or unbonded post-tensioning if known. |
| Material specification | Specify PC Wire, PC Strand or PC Bar. Include the material code if available, nominal diameter, strength grade, wire count for strand, relaxation and protection requirements. |
| Standards and documentation | Give the standard designation and edition. List required mill test certificates (MTC) or batch test reports, certificates of origin or quality, and any contractually required additional tests. |
| Supply scope | Specify steel only or include anchorages, wedges, ducts and accessories. Share the system code or material schedule if available. |
| Quantity and delivery | Give the weight, coil count or length from the material schedule, delivery location, required date and quantities by shipment where applicable. |
Short request template
Please quote for …
Steel type, specification or available details …
Estimated quantity … · Delivery location … · Required date …
Documents or accessories needed … · Details to clarify with INDUSVINA …
If specifications are incomplete, describe the member, estimated requirements and information you have. Leave a phone number for follow-up. An email address is optional.
Request a quoteWhat should you check at delivery?
- Correct material. Match the order with the coil, bundle or package label. Verify product type, nominal diameter, strength grade and specified protection.
- Correct batch and quantity. Record batch, coil or pack codes. Match coil count, packages, weight or length to the delivery note using the ordered unit.
- Condition. Check packaging for water ingress and inspect accessible areas for corrosion, kinks, crushing or scratches. On protected strand, look for tears, punctures or coating separation.
- Documents match the batch. Match label identifiers to mill certificates or batch reports. Check certificates of origin or quality and accessory documents as ordered. Follow the approved inspection plan for sampling and further testing.
- Record deviations before releasing stock. Photograph labels and damage. Set aside nonconforming, damaged or untraceable coils or packages for authorized review before use.
From delivery to acceptance. Store to manufacturer and project requirements and retain batch identification through use. Before stressing, verify concrete conditions, calibration and approved inspection points. Retain material and stressing records and applicable protection or grouting records. Use approved documents for stressing force, expected elongation and tolerances.
See the FHWA post-tensioning installation and grouting manual.
How can INDUSVINA help?
INDUSVINA reviews available specifications and estimated quantities, helps clarify missing details, checks sourcing options and material documents, and confirms packaging, delivery and paperwork for each request. Material approval, substitutions and acceptance are handled by the authorized project parties.
Send your specifications for a quoteStill confirming the specification? Share the application, estimated quantity and delivery location if available.
Explore INDUSVINA
FROM SPECIFICATIONS TO A SUPPLY PLAN
Which project needs
prestressing strand?
Send the strand type, available specifications, quantity and delivery location. You can enquire before all details are ready.