LESSON 2/13 – BASIC CONCEPTS (WORD EXPLANATION)

ARTICLE 2 – KEY CONCEPTS IN THE CONSTRUCTION LAW

INDUSVINA · TTS Reader (English)
Speed 1.00x
Status: Waiting for you to press “Play article”.

Legal basis: This article summarizes core terms in Article 3 – Interpretation of terms, Chapter I – General provisions of:

1. Why do definitions matter?

Article 3 functions as the “internal glossary” of the Construction Law. Whenever a technical term appears later in the text, it must be interpreted according to this article rather than everyday usage. For investors, contractors and consultants, mastering these definitions helps reduce ambiguity and potential disputes.

2. Selected key terms (plain-language summary)

2.1. Construction investment activities
This covers the entire process from project preparation and implementation to completion and operation of a construction work. In practice: from the moment an idea is formed until the work is put into use, all related activities are construction investment activities.

2.2. Construction investment project
A collection of proposals on the use of capital for new construction, repair, renovation or expansion of a work, in order to develop, maintain or improve the quality of the work, products or services.

2.3. Construction work
A construction work is a product created by human labor, construction materials and equipment installed in the work, attached to land or a fixed location, possibly above or below ground or water. Houses, factories, bridges, roads, ports and irrigation works are all construction works.

2.4. Pre-feasibility and feasibility study reports

  • Pre-feasibility study report: provides a preliminary study on the necessity, feasibility and effectiveness of the investment, serving as a basis for the construction investment policy decision.
  • Feasibility study report: provides detailed analysis of technical solutions, financial plan and socio-economic effectiveness, serving as a basis for the investment decision.

2.5. Project owner
The project owner is the organization or individual that owns, borrows or is assigned capital to manage and use for implementing a construction investment project, and takes primary responsibility for quality, schedule, efficiency and legal compliance within its rights and obligations.

2.6. Contractors, general contractors and subcontractors

  • Contractor: an organization or individual with adequate capacity, entering into contracts with the project owner to perform survey, design, construction, supervision, consulting or equipment supply.
  • General contractor: a contractor directly signing with the project owner and bearing overall responsibility, possibly subcontracting parts of the work.
  • Subcontractor: a contractor performing part of the work under a contract with the general or main contractor.

2.7. Construction planning and construction permit

  • Construction planning: the arrangement of space, technical and social infrastructure and architecture over a defined territory, serving as a basis for construction projects.
  • Construction permit: a legal document issued by a competent authority, allowing new construction, renovation, repair or relocation of a work in accordance with planning, standards and regulations.

3. Practical tips

  • When a term appears frequently (e.g. “important national project”, “special-grade work”), refer back to Article 3.
  • When drafting contracts, consider quoting definitions from the Law to avoid misinterpretation.
  • Create an internal glossary for each project, aligned with Article 3, so all parties use the same language.
Related Articles
Construction project management
Construction project management
Construction project management - practical knowledge information from INDUSVINA for customers, partners and professionals in Vietnam and international markets.
More Details
Latest Construction Law
Latest Construction Law
Latest Construction Law - practical knowledge information from INDUSVINA for customers, partners and professionals in Vietnam and international markets.
More Details
LESSON 3: CONSTRUCTION PROJECT OPERATING SYSTEM
LESSON 3: CONSTRUCTION PROJECT OPERATING SYSTEM
Projects do not fail because of engineering alone. They break down because operations are fragmented. Most construction projects do not collapse because the team lacks technical capability....
More Details
Article 2: THE 4 PILLARS OF PROJECT MANAGEMENT – MISS ONE PILLAR, THE SYSTEM COLLAPSES
Article 2: THE 4 PILLARS OF PROJECT MANAGEMENT – MISS ONE PILLAR, THE SYSTEM COLLAPSES
INDUSVINA Viewpoint Miss one pillar and the project doesn’t just weaken — it loses balance and collapses. Project management is building an operating system, not merely “getting tasks done....
More Details
LESSON 1: WHAT IS CONSTRUCTION PROJECT MANAGEMENT?
LESSON 1: WHAT IS CONSTRUCTION PROJECT MANAGEMENT?
In the construction industry, many people confuse: A site supervisor A construction coordinator And a true project manager. A good site supervisor can help a project progress quickly....
More Details
Lesson 2/4 – Quality
Lesson 2/4 – Quality
Quality is not just about looks, nor is it about “doing it by experience” or “finishing it and then adjusting it later”. In construction projects, QUALITY = THE DEGREE OF CONFORMITY of the...
More Details
Lesson 5/5 – Closing / Project completion according to PMI – transparent, sufficient, standard & responsible closing
Lesson 5/5 – Closing / Project completion according to PMI – transparent, sufficient, standard & responsible closing
Closing is not just “closing the file”, but the time to prove the true value of the entire project: acceptance – handover – contract closing – lessons learned – file storage, from the perspective...
More Details
LESSON 4/5: Project Monitoring & Control
LESSON 4/5: Project Monitoring & Control
If Initiating is defining the goal, Planning is drawing the map, Executing is marching, then Monitoring & Controlling is the “sword and shield” of the project manager – both attacking deviations...
More Details
Lesson 2/5 – Create a detailed, feasible, and controllable project plan
Lesson 2/5 – Create a detailed, feasible, and controllable project plan
Objectives of the Planning phase: ✔️ Define the entire scope of work ✔️ Design a clear, feasible implementation roadmap ✔️ Anticipate risks and countermeasures ✔️ Clarify quality, cost, information,...
More Details
Lesson 1/5 – Initiating – Project Initialization
Lesson 1/5 – Initiating – Project Initialization
Initiation is the “first gate” of every project: where we define what the project is, why it needs to be done, who is involved, and who is responsible. If this step is superficial, the whole...
More Details

INDUSVINA – International Standard Industrial EPC & MRO Contractor

EPC Construction – M&E Engineering – Steel Structures – Global Export Services

Trusted Partner for Industrial Plants, Manufacturing & FDI Enterprises